Country | End User | Project Description | Equipment Type | Process Duty |
---|---|---|---|---|
Algeria
|
Sonatrach
|
Skikda Oil Refinery
|
Foam Fire Fighting Skids
|
22,000 l/min
|
Algeria
|
SonaHess
|
Gassi El Agreb Project
|
Fresh Water Tank
|
32 m3
|
Algeria
|
Sonatrach
|
GNL-3Z Project
|
LNG Metering Skids
|
400,086 m3/h
|
Algeria
|
SonaHess
|
Gassi El Agreb Project
|
Test Oil Tank
|
52 m3
|
Algeria
|
CEPSA
|
Ourhoud Project
|
Wellhead Desander Vessel & Skid
|
3.6 m3
|
Australia
|
GLNG Operations
|
GLNG Plant Project
|
Gas Metering Package
|
840,323 Sm3/h
|
Azerbaijan
|
BP
|
AzMeCo Project
|
Compressed Air & Nitrogen Generation Skid
|
1412 m3/h
|
Azerbaijan
|
BP / Azerbaijan International Oil Company
|
Chirag Project
|
Fire Fighting Deluge Skid
|
800 GPM
|
Azerbaijan
|
BP / Azerbaijan International Oil Company
|
Chirag Project
|
Firewater Hose Reel Sets
|
N/A
|
Belarus
|
JSC Mozyr Refinery
|
JSC Refinery
|
Orifice Chamber Vessel
|
137.5 m3
|
Brazil
|
Petrobras
|
Caratinga Field
|
Fuel Gas Knock Out Vessel
|
17.5 m3
|
Brazil
|
Petrobras
|
Barracuda Oil Fields
|
Fuel Gas Preheater (Heat Exchanger)
|
290 kW
|
Brazil
|
Petrobras
|
Petroquimica Revap Refinery
|
Glycol Contactor Tower
|
11.5 m2
|
Brazil
|
Petrobras
|
Barracuda Oil Fields
|
TEG Regeneration Package
|
2,898 kg/hr
|
Canada
|
Exxon Mobil
|
Kearl Lake Oil Sands Project
|
Fire Fighting Deluge Skids
|
1350 GPM
|
Czech Republic
|
Borsod Chem
|
BorsodChem MCHZ Plant, Ostrava
|
Hydrogen Purification Unit – Switching Valve Skid
|
6,000 Nm3/h
|
Egypt
|
Arab Petroleum Pipelines Company
|
Sumed Project
|
Bi-Directional Prover Skid
|
4000 m3/h
|
Egypt
|
BAPETCO
|
Obaiyed Project
|
Contactor Tower Internals
|
850 MMSCFD
|
Egypt
|
BAPETCO
|
Obaiyed Project
|
Dehydration Units
|
880 MMSCFD
|
Egypt
|
BAPETCO
|
Obaiyed Project
|
Fuel Gas Package
|
30.2 MMSCFD
|
Egypt
|
GASCO
|
Cairo M&R Station
|
Metering & Reduction Station
|
0.96 MMNm3/d
|
Germany
|
Storag Etzel
|
Crystal Project
|
CO2 Vent Snuffing Package
|
90 kg
|
Holland
|
Ultramar
|
J6A Project
|
Fuel Gas Package
|
30 MMNm3/d
|
Holland
|
Amoco
|
P15D Project
|
Fuel Gas Package
|
9.2 MMSCFD
|
Holland
|
Placid International Oil
|
K9A & K9C Project
|
Gas Dehydration Units
|
66 MMSCFD
|
Holland
|
Unknown *
|
L11 Project
|
Skimmer Tank
|
30 m3
|
Holland
|
Placid International Oil
|
K9A & K9B Project
|
Water Treater
|
2.5 m3/h
|
Hong Kong
|
Lamma Power Station
|
Lamma Power Station
|
Fuel Gas Filters
|
1.45 m3
|
India
|
Oil & Natural Gas Corporation Ltd
|
BPCL & HPCL Projects
|
Calibration Skid
|
N/A
|
India
|
Oil & Natural Gas Corporation Ltd
|
Uran Plant Project
|
Crude Oil Metering Station – Proving Skid
|
2,800 m3/h
|
Indonesia *
|
Exxon Mobil
|
FPSO
|
Crude Oil Metering Skid
|
30,000 bpd
|
Iran
|
National Iranian Gas Company
|
Unknown *
|
Fuel Gas Package
|
0.85 MMSCFD
|
Iraq
|
South Oil Company
|
North Rumaila Degassing Stations
|
30″ Bi-Directional PIG Prover System
|
N/A
|
Iraq
|
South Oil Company
|
Missan Ammara Degassing Project
|
Crude Oil Heater Burners & Fuel Gas BMS Skids
|
2,700 kW
|
Iraq
|
South Oil Company
|
Missan Field
|
Fuel Gas Control Skids
|
250 Sm3/h
|
Iraq
|
South Oil Company
|
Various
|
Gas Metering Packages
|
Various
|
Iraq
|
Northern Oil Company
|
Saddam Field
|
Gas/Oil Treatment System
|
150M bbd / 360 MMSCFD
|
Iraq
|
South Gas Company
|
Basra-SGC-C15-2010
|
Wet Gas Metering Skid
|
448 m3/h
|
Iraq
|
South Oil Company
|
CPF Tank Expansion
|
Metering Skid
|
150 m3/h
|
Ireland
|
Marathon Oil
|
Upgrade Project
|
Reboiler Firetube
|
48 m2
|
Kazakhstan
|
Kazakoil
|
GPU Kozashai Project
|
Amine Surge Tank
|
23.16 m3
|
Kazakhstan
|
Atyrau Refinery
|
Refinery Reconstruction Project
|
Deaerator Vessel
|
4.45 m3
|
Kazakhstan
|
TengizChevoil
|
Second Generation Project
|
Fire Fighting Deluge Skid
|
600 GPM
|
Kazakhstan
|
Kazakoil
|
GPU Kozashai Project
|
MEG Reboiler
|
5.2 m3
|
Kazakhstan
|
Kazakoil
|
GPU Kozashai Project
|
Merkaptan Scavenger
|
2.52 m3
|
Libya
|
Lundin
|
Naga Field Development
|
Crude Oil Process Facilities
|
40,000 bpd
|
Libya
|
Veba Oil
|
Ras Lanuf
|
Desalter Firetubes
|
7.42 m2
|
Libya
|
Repsol Oils
|
NC-186 Field
|
Flare KO Pots
|
30.5 m3
|
Libya
|
Arabian Gulf Oil Company Ltd
|
Messla CPF
|
Fuel Gas Compressor System
|
2.8 MMNm3/d
|
Libya
|
Waha Oil Company
|
Gialo Power Station
|
Fuel Gas Filter Separators
|
1.4 m3
|
Libya
|
Jawaby Oil Company
|
South Defa Power Station
|
Fuel Gas Knock Out Pots
|
0.08 m3
|
Libya
|
Waha Oil Company
|
Faregh Phase 2
|
Fuel Gas Knock Out Vessel
|
1.135 m3
|
Libya
|
Arabian Gulf Oil Company Ltd
|
Nafoora Gas Lift Project
|
Fuel Gas System
|
380 MMNm3/d
|
Libya
|
Arabian Gulf Oil Company Ltd
|
Messla CPF
|
Fuel Gas System
|
2.8 MMNm3/d
|
Libya
|
Arabian Gulf Oil Company Ltd
|
Nafoora Gas Lift Project
|
Gas Dehydration Units
|
15 MMSCFD
|
Libya
|
Waha Oil Company
|
Faregh Phase 2
|
LP Flare Gas KO Drum
|
23.52 m3
|
Libya
|
Mellitah Oil and Gas Company
|
GOSP Elephant Field F-NC-174
|
Pump Units
|
30 m3/h
|
Libya
|
Arabian Gulf Oil Company Ltd
|
Nafoora Field
|
Slug Catcher
|
116.65 m3
|
Malaysia
|
Mitsubishi Heavy Industries
|
Tuanku Jafar Power Station Rehabilition
|
Fuel Gas Filter Separators
|
150,000 Nm3/h
|
Malaysia
|
Tenaga Nasional Berhad
|
Jaafar Power Station
|
Fuel Gas Knock-Out / Filter Separators Vessels
|
150,000 Nm3/h
|
Malaysia
|
Shell
|
E-11KA Project
|
Fuel Gas Package
|
10 MMSCFD
|
Malaysia
|
Shell
|
Seraya II
|
Separator & Coalescer Plate Packs
|
50 MMSCFD
|
Nigeria
|
Chevron / NNPC
|
Escravos – Lagos Gas Pipeline
|
Condensate Treatment System
|
1.2 MMSCFD
|
Norway
|
Aker
|
Alvheim Project
|
Glycol Regeneration Package
|
4,818 kg/hr
|
Norway
|
BP
|
Valhall Field
|
Lube Oil Tank
|
7.6 m3
|
Norway
|
Statoil Norway
|
Gjoa Semi EPCH
|
TEG Regeneration Package
|
1.2 m3
|
Oman
|
PDO
|
Birba Project
|
Dehydration Units
|
60 MMSCFD
|
Oman
|
PDO
|
Unknown *
|
Dehydration Units
|
28125 kg/hr
|
Oman
|
PDO
|
Nimr Produced Water Project
|
Produced Water Metering Skid
|
45,000 bpd
|
Qatar
|
Trags Engineering
|
Trags Engineering
|
In-Line Strainer
|
8.864 m3
|
Russia
|
South Shapinko Oilfield
|
Fuel Gas Sweetening & Dehydration Upgrade
|
Amine & TEG Regeneration Package
|
2.32 m3/h / 160kW
|
Russia
|
South Shapinko Oilfield
|
South Shapkino Oilfields
|
Amine & TEG Transfer Pumps
|
6m3/h
|
Russia
|
Guardian Glass
|
Cooling Water Upgrade
|
Chemical Dosing Skids
|
6 l/h
|
Russia
|
South Shapinko Oilfield
|
South Shapkino Oilfields
|
Chemical Injection Package
|
0.5 l/h
|
Russia
|
Guardian Glass
|
Ryazan Plant
|
Closed Loop Cooling Water Filter Skids
|
200 m3/h
|
Russia
|
Guardian Glass
|
Cooling Water Upgrade
|
Cooling Water Skids
|
300 m3/h
|
Saudi Arabia
|
SABIC / SADAF
|
Air Drying Package
|
Air Dryer Package
|
2,400 kg/hr
|
Spain
|
Guardian Glass
|
Tudela Plant
|
Closed Loop Cooling Water Filter Skids
|
310 m3/h
|
Spain
|
Enagas
|
Palos de la Frontera LNG Terminal
|
Sea Water Filters
|
7.28 m3
|
Syria
|
Oudeh Petroleum Company
|
Oudreh Field
|
Crude Oil Metering Skid
|
12,000 bbd
|
Syria
|
Oudeh Petroleum Company
|
Tishrine Field
|
Crude Oil Metering Skid
|
12,000 bbd
|
Syria
|
Hayan Petroleum Company
|
Jihar Stage 3
|
Foam Induction Skid
|
3000 litres
|
Syria
|
Al Furat Petroleum Company
|
Thayem CPF
|
Gas Lift Package
|
3 MMNm3/d
|
Turkey
|
BP
|
BTC Pipeline
|
De-waxing Units
|
200 m3/h
|
UAE
|
ADCOP
|
ADCOP Pipeline
|
Trailer Mounted Foam Fire Fighting Skids
|
10,000 GPM
|
UAE
|
Sharjah Electricity & Water Authority
|
Sharjah Power Station
|
Filter Separator Internals
|
37 MMNm3/d
|
UAE
|
ADCO
|
ASAB FFD Project
|
Foam Induction Skid
|
5 m3
|
UAE
|
Sharjah Electricity & Water Authority
|
Sharjah Power Station
|
Gas Treatment System
|
37 MMNm3/d
|
UAE
|
Abu Dhabi Oil Refining Company
|
Low Sulphur Gasoline Project
|
Oil/Water Separator
|
30 m3
|
UAE
|
Abu Dhabi Water & Electricity Company
|
Umm Al Nar Power Station
|
Water Drain Tank
|
3 m3
|
UK
|
Mcintyre UK
|
RE610 Batch Reactor
|
Batch Reactor Control System
|
N/A
|
UK
|
Hodgsons Chemicals
|
Caustic Tank Upgrade
|
Caustic Tank Fill System
|
5 m3/h
|
UK
|
Royal Mint
|
Cooling Gas Coil Replacement
|
Cooling Gas Coil
|
20 m3/h
|
UK
|
Guardian Glass
|
Cooling Water Upgrade
|
Cooling Water Skids
|
300 m3/h
|
UK
|
CETCO
|
Separation Trial
|
Crude Oil/ Water Separation Vessel
|
1000 bpd
|
UK
|
British Sugar
|
Optimisation of Process Production
|
Cyclone Separator
|
|
UK
|
BP
|
Hyde Field
|
Dehydration Units
|
74MMSCFD
|
UK
|
Conoco
|
P010 Project
|
Fuel Gas Package
|
11.2 MMSCFD
|
UK
|
Scottish Power
|
Hatfield Moor Underground Gas Storage Site
|
Fuel Gas System
|
900 kg/hr
|
UK
|
EnCana / Nexen
|
Gas Dehydration Package
|
GLYCOL VESSLS
|
2.32 m3
|
UK
|
Caledonian Petroleum Services
|
Plant upgrade
|
HP Gas Scrubber
|
0.9 m3
|
UK
|
Scottish Gas Networks
|
Lochmaben AGI Upgrade
|
LP Steam Preheater
|
120 kW
|
UK
|
Scottish Gas Networks
|
Dumfries AGI Upgrade
|
LP Steam Preheater
|
180 kW
|
UK
|
Northern Gas Networks
|
Low Moor AGI Upgrade
|
LP Steam Preheater
|
120kW
|
UK
|
Northern Gas Networks
|
Thornaby Valve AGI Upgrade
|
LP Steam Preheater
|
180 kW
|
UK
|
National Grid Distribution
|
Cadwell Lane AGI Upgrade
|
LP Steam Preheater
|
70 kW
|
UK
|
Expro North Sea
|
Export Metering Upgrade
|
Metering Skid
|
60,000 bpd
|
UK
|
National Grid
|
Bio Injection Project
|
Metering Skid
|
500 Sm3/h
|
UK
|
Centrica Storage
|
York Field Onshore Gas Plant
|
Methanol Transfer Pump Skid
|
3.4 m3/h
|
UK
|
ATP Oil & Gas
|
Cheviot Platform
|
Oil Degasser Vessel
|
90 m3
|
UK
|
Exchem
|
Replacement Tank
|
Oleum Storage Tank
|
14.7 m3
|
UK
|
Star Energy
|
Humbly Grove Gas Plant
|
Replacement Firetube
|
999 kW
|
UK
|
Yorkshire Water
|
Filter Upgrade
|
Sand Filter and Aeration Blower Skids
|
80 m3/h
|
UK
|
Centrica Energy
|
Rivers Field
|
Sour Gas Vent Skid
|
7,000 kg/hr
|
UK
|
National Oilwell Varco
|
Offshore UK
|
Storage Tank
|
16.3 m3
|
UK
|
Croda Chemicals
|
Tolulene Vapour Recovery
|
Vapour Recovery System
|
18 m3/h
|
UK
|
Guardian Glass
|
Steam System Upgrade
|
Waste Heat Recovery Turnkey project
|
N/A
|
UK
|
Huntsman UK
|
Plant upgrade
|
Xylene Run Down Air Cooler
|
320 kW
|
Vietnam
|
Unknown *
|
Rang Dong Project
|
Oil Treating Plant
|
26,762 kg/hr
|
Trust and Worth
Our Clients
Previous
Next